Setting up T&L
Here is a checklist for setting up T&L
1) Check the Referential Integrity flag only in Production or when testing for RI
2) Ensure that the T&L Dates table if filled. Click on ‘Load Dates’ to fill this table till the date that you require. T&L batch processes will not run if dates are not loaded properly.
3) Select the ‘Email Notifications’ checkbox to enable mail notifications for
any of the cases listed in the page if required
4) Setup Time-Zone Offsets
5) Build Time Period Calendar
7) A Pay System needs to be configured only if Time and Labor is integrated
to any Payroll system. Peoplesoft pre-delivers two Pay Systems – NA
Payroll and Global Payroll.
8) Setup TRCs
9) Setup TRC Program
10) Setup Time Reporting Template
11) Setup Value Lists
12) Setup Time and Labor Rules
13) Setup Rule Program
14) Setup Workgroup
15) Enroll employees
16) Setup Dynamic Group
1) Check the Referential Integrity flag only in Production or when testing for RI
2) Ensure that the T&L Dates table if filled. Click on ‘Load Dates’ to fill this table till the date that you require. T&L batch processes will not run if dates are not loaded properly.
3) Select the ‘Email Notifications’ checkbox to enable mail notifications for
any of the cases listed in the page if required
4) Setup Time-Zone Offsets
5) Build Time Period Calendar
7) A Pay System needs to be configured only if Time and Labor is integrated
to any Payroll system. Peoplesoft pre-delivers two Pay Systems – NA
Payroll and Global Payroll.
8) Setup TRCs
9) Setup TRC Program
10) Setup Time Reporting Template
11) Setup Value Lists
12) Setup Time and Labor Rules
13) Setup Rule Program
14) Setup Workgroup
15) Enroll employees
16) Setup Dynamic Group
Comments